Skip to product information
1 of 7

Vesgantti Large Ottoman for Modular Sofa, 29.5" Corduroy Pouf Ottoman

Vesgantti Large Ottoman for Modular Sofa, 29.5" Corduroy Pouf Ottoman

Regular price $259.98 USD
Regular price Sale price $259.98 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

The Vesgantti Large Ottoman for Modular Sofa, 29.5" Corduroy Pouf Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Green represents a versatile approach to daily routines, delivering reliable performance consistently. measuring 26.4"D x 29.5"W x 19.7"H, weighing 34.6 Pounds, available in 29.5" - Ottoman Green. Notable features include multifunctional ottoman and ottoman versatile, contributing to its user-tested character.

Key Features

  • Multifunctional Ottoman - A versatile essential crafted for dynamic living. Serve as an entryway footstool, guest seating, plush footrest beside sofas/chairs, or even a bedside perch. Effortlessly blending form and function, its adaptable design elevates entryways, living rooms, and bedrooms alike—ideal for modern spaces seeking utility without compromising style
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This ottoman for modular sofa is known for its sturdiness and solidity. Additionally, the ottoman pouf features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Ergonomic & Comfortable - The spring cushions of this ottoman absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 26.4-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
  • Durable Corduroy Fabric - This foot rest has a unique pattern and texture, characterised by parallel ridges that give it a smooth and soft feel. The pouf ottoman has a clear and rounded velvet-like surface, which adds to its luxurious appearance. Additionally, our footstool is thick and wear-resistant, making it an excellent choice for those who demand comfort and durability
  • Easy Assembly - Complete with tools and detailed instructions, assembly is quick and easy. Color/size may vary slightly due to display/manual measurement. Upon unpacking, cushions may appear compressed; allow 24-48 hours to fully fluff. Pat gently for faster recovery and enhanced comfort. Contact us with questions

Why Choose the Vesgantti Large Ottoman for Modular Sofa

The Vesgantti Large Ottoman for Modular Sofa, 29.5" Corduroy Pouf Ottoman with Spring Cushion, Rectangle Foot Rest for Couch, Entrance Footstool with Wood Legs, Footstool for Living Room, Bedroom, Green demonstrates quality engineering with practical features like multifunctional ottoman, leading to thoughtful design that holds up over time.

Best For

The Vesgantti Large Ottoman for Modular Sofa is best suited for: modern spaces seeking utility without compromising style.

Quick Summary

The Vesgantti Large Ottoman for Modular Sofa is a Ottomans product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 26.4 inches. Seat Height: 5.5 Inches. Seating Capacity: 1. Price: $259.98.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 26.4 inches
Seat Height 5.5 Inches
Seating Capacity 1
Product Dimensions 26.4"D x 29.5"W x 19.7"H
Item Weight 34.6 Pounds
Type Standard
Color 29.5" - Ottoman Green
Style Mid-Century Modern

Product features

Materials and care

Merchandising tips

View full details
Your cart
Product Product subtotal Quantity Price Product subtotal
Vesgantti Large Ottoman for Modular Sofa, 29.5" Corduroy Pouf Ottoman by Vesgantti
Vesgantti Large Ottoman for Modular Sofa, 29.5" Corduroy Pouf OttomanSPH-B0FCS6RTKX
Vesgantti Large Ottoman for Modular Sofa, 29.5" Corduroy Pouf OttomanSPH-B0FCS6RTKX
$259.98/ea
$0.00
$259.98/ea $0.00