Skip to product information
1 of 7

Vesgantti 97" Modular Sectional Sofa Dark Gray, L-Shaped Couch

Vesgantti 97" Modular Sectional Sofa Dark Gray, L-Shaped Couch

Regular price $779.98 USD
Regular price Sale price $779.98 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

The Vesgantti 97" Modular Sectional Sofa Dark Gray, L-Shaped Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment reflects ergonomic thinking, providing long-term durability suitable for dining areas. measuring 57.9"D x 96.8"W x 35"H, weighing 800 Pounds. Notable features include modular sectional and sectional sofa, contributing to its comfortable character.

Key Features

  • Modular Sectional Sofa - Features a removable ottoman, letting you configure it as a cozy L-shaped sectional sofa or use the ottoman independently as a footrest, 3-seater couch, or additional seating. Rearrange freely to suit your space—perfect for living rooms, apartments, or bedrooms. Its practical flexibility and stylish design effortlessly enhance any ambiance, allowing you to craft a personalized setup with ease
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This modular sofa is known for its sturdiness and solidity, with a maximum weight capacity of 800 lbs. Additionally, the sofa couch features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Ergonomic & Comfortable - The spring cushions of this L-shaped sofa absorb the impact of daily use, preventing rapid wear and tear and extending the life of the sofa couch. Its 21-inch seat depth shines, providing ample support for both upright and reclining seating, while the matching 26.4-inch ottoman enhances relaxation by providing leg support or additional seating, which together ensure excellent lumbar support and pressure relief, making every moment of relaxation feel relaxed and luxurious
  • Durable Corduroy Fabric - This corduroy sofa couch has a unique pattern and texture, characterised by parallel ridges that give it a smooth and soft feel. The modern couch has a clear and rounded velvet-like surface, which adds to its luxurious appearance. Additionally, sectional couch is thick and wear-resistant, making it an excellent choice for those who demand comfort and durability
  • Shipped in 2 Separate Packages - kindly allow for their arrival at different times. Slight color/size variations may occur due to displays/manual measurements. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better. Contact us with questions

Why Choose the Vesgantti 97" Modular Sectional Sofa Dark Gray

The Vesgantti 97" Modular Sectional Sofa Dark Gray, L-Shaped Couch with Movable Ottoman, Comfy Corduroy Couch with Spring Cushion, Modular Sofa with Deep Seat for Living Room, Bedroom and Apartment brings together minimalist and multi-functional qualities, plus modular sectional, to deliver lasting comfort in sofas & couches settings.

Best For

The Vesgantti 97" Modular Sectional Sofa Dark Gray is best suited for: living rooms.

Quick Summary

The Vesgantti 97" Modular Sectional Sofa Dark Gray is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 21 inches. Seat Height: 5.5 Inches. Weight Limit: 800 Pounds. Price: $779.98.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 21 inches
Seat Height 5.5 Inches
Weight Limit 800 Pounds
Seating Capacity 3
Product Dimensions 57.9"D x 96.8"W x 35"H
Item Weight 170.8 Pounds
Leg Length 7.5 Inches
Type Sectional

Product features

Materials and care

Merchandising tips

View full details
Your cart
Product Product subtotal Quantity Price Product subtotal
Vesgantti 97" Modular Sectional Sofa Dark Gray, L-Shaped Couch by Vesgantti
Vesgantti 97" Modular Sectional Sofa Dark Gray, L-Shaped CouchSPH-B0FCS89J7F
Vesgantti 97" Modular Sectional Sofa Dark Gray, L-Shaped CouchSPH-B0FCS89J7F
$779.98/ea
$0.00
$779.98/ea $0.00