Skip to product information
1 of 7

Vesgantti 38.5" Accent Chair

Vesgantti 38.5" Accent Chair

Regular price $590.00 USD
Regular price Sale price $590.00 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

For everyday small spaces, the Vesgantti 38.5" Accent Chair with Movable Ottoman, Comfy Corduroy Armchair with Spring Cushion, Reading Chair with Ottoman, Modern Single Sofa for Living Room, Bedroom and Apartment, Dark Blue balances durable build with simple assembly. Constructed using Corduroy Fabric, Wood, measuring 31.5"D x 38.5"W x 35"H, available in 38.5" - 1 Seater & Ottoman Dark Blue. Notable features include accent chair and versatile single-seater, contributing to its durable character.

Key Features

  • Accent Chair with Ottoman - This versatile single-seater sofa suits living rooms, bedrooms, or studies, with a sleek design that fits modern and traditional decor. Paired with a movable ottoman, it offers extra comfort for leg support—perfect for reading, watching TV, or unwinding, letting you stretch out and relax
  • Ergonomic & Comfortable - The spring cushions of this reading chair with ottoman absorb the impact of daily use, preventing rapid wear and tear and extending the life of the footstool. With a 20.9-inch seat depth, its generously sized seat offers ample support for both sitting and propping up feet, enhancing relaxation with exceptional pressure relief that makes every moment feel effortlessly luxurious
  • FSC Certified Solid Wood - Made with materials from well-managed forests that support sustainable forestry practices. This accent chair is known for its sturdiness and solidity, with a maximum weight capacity of 440lbs. Additionally, the single sofa chair features non-slip protective backing on the bottom of the legs, providing stability and preventing damage to flooring
  • Durable Corduroy Fabric - This corduroy sofa chair features distinct parallel ridges for a smooth, plush feel. Its velvety surface and modern design exude luxury, while the thick, wear-resistant build ensures lasting comfort. Available in four colors—note slight hue variations due to monitors and lighting
  • Shipped in 2 Separate Packages - kindly allow for their arrival at different times. Easy 30-min assembly without additional tools. Cushions take 24-48 hours to fully recover due to compressed packaging. You can pat the cushion to make it fluffy and feel better. Contact us with questions

Why Choose the Vesgantti 38.5" Accent Chair with Movable Ottoman

Choose the Vesgantti 38.5" Accent Chair with Movable Ottoman, Comfy Corduroy Armchair with Spring Cushion, Reading Chair with Ottoman, Modern Single Sofa for Living Room, Bedroom and Apartment, Dark Blue for the combination that chairs buyers actually need: multi-functional build, accent chair, and home aesthetics.

Best For

The Vesgantti 38.5" Accent Chair with Movable Ottoman is best suited for: reading.

Quick Summary

The Vesgantti 38.5" Accent Chair with Movable Ottoman is a Chairs product by Vesgantti. Brand: Vesgantti. Color: 38.5" - 1 Seater & Ottoman Dark Blue. Material: Corduroy Fabric, Wood. Product Dimensions: 31.5"D x 38.5"W x 35"H. Size: 38.5" - 1 Seater & Ottoman. Price: $590.

Product Specifications

Specification Details
Brand Vesgantti
Color 38.5" - 1 Seater & Ottoman Dark Blue
Material Corduroy Fabric, Wood
Product Dimensions 31.5"D x 38.5"W x 35"H
Size 38.5" - 1 Seater & Ottoman

Product features

Materials and care

Merchandising tips

View full details
Your cart
Product Product subtotal Quantity Price Product subtotal
Vesgantti 38.5" Accent Chair by Vesgantti
Vesgantti 38.5" Accent ChairSPH-B0G522Q9QV
Vesgantti 38.5" Accent ChairSPH-B0G522Q9QV
$590.00/ea
$0.00
$590.00/ea $0.00