Skip to product information
1 of 9

Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional

Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional

Regular price $2,399.98 USD
Regular price Sale price $2,399.98 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

Functional and durable, the Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional Sofa with Deep Seat, Convertible Chenille Cloud Couches for Living Room, No Assembly Required, Green earns its place in living rooms through everyday usability. measuring 112.2"D x 143.7"W x 31.5"H, weighing 3850 Pounds, available in Green. Notable features include flexible modular and modular design, contributing to its durable character.

Key Features

  • Flexible Modular Design: The L-shaped sectional sofa has 4 separate sections. Each module can be easily moved and reassembled into loveseat, L shaped sofa, chaise lounge, sleeper sofa, or oversized family sectional couch to match your lifestyle. The modular design allows you to freely create your ideal layout and adapt to ever-changing spaces. All modular seats have a anti-slip design on the bottom to prevent the sofa from sliding during daily use
  • Spacious & Comfortable: The 114 inch modular sofa features 31.5 inch width and 29.5 inch deep seats, providing ample seating space to lounge for you and your family, especially perfert for heavy people. 9.8 inch wide armrests is an ideal place for placing drinks or laptop. The setional couch can easily transforms any room into a warm and comfortable haven for relaxing, entertaining guests, or enjoying a family movie night
  • Durable and Long-lasting Support: This modern sofa is crafted entirely from high-resilience foam, providing lasting support and ultimate comfort. The foam utilizes quick rebound technology, maintaining its shape after prolonged use while providing a comfortable and stable seat. This full foam couch is perfect for a living room, bedroom, office, apartment, guest rooms, and children's play areas, encouraging children to play on its luxurious surface
  • Premium Chenille Fabric: The modular sectional sofa is made of high-quality chenille fabric, which is soft, pill-resistant and pet-friendly; ensuring long-term durability and making it perfect for daily use. The stylish and solid color design adds a touch of luxury and enhances the beauty of your living space. We have a variety of colors for option to meet different decoration styles (Note: Colors may vary slightly due to lighting or monitor settings)
  • No Assembly Required: No tools or complicated setup are required. Our modular couch is vacuum-packed; just simply unpack, gently pat the sections, and wait 72 hours for fully expand. Ultimate comfort and convenience are at your fingertips. The boneless sofa is packaged in 2 boxes, which may arrive on different days. Before assembling, please check all packages. If you have any questions or are dissatisfied with our sofa, please feel free to contact us

Why Choose the Vesgantti 143.7" Oversized Boneless Couch

For long-term sofas & couches use, the Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional Sofa with Deep Seat, Convertible Chenille Cloud Couches for Living Room, No Assembly Required, Green offers multi-functional build, flexible modular, and long-term durability — a combination that pays off over time.

Best For

The Vesgantti 143.7" Oversized Boneless Couch is best suited for: Non Slip, a living room, daily use.

Quick Summary

The Vesgantti 143.7" Oversized Boneless Couch is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Weight Limit: 3850 Pounds. Seating Capacity: 7. Product Dimensions: 112.2"D x 143.7"W x 31.5"H. Price: $2399.98.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required No
Weight Limit 3850 Pounds
Seating Capacity 7
Product Dimensions 112.2"D x 143.7"W x 31.5"H
Item Weight 85 Pounds
Type Sectional
Color Green
Special Feature Non Slip
Room Type Bedroom, Guest Room, Home Office, Living Room

Product features

Materials and care

Merchandising tips

View full details
Your cart
Product Product subtotal Quantity Price Product subtotal
Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular Sectional by Vesgantti
Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular SectionalSPH-B0H2W3CHDD
Vesgantti 143.7" Oversized Boneless Couch, Modern 7 Seater Modular SectionalSPH-B0H2W3CHDD
$2,399.98/ea
$0.00
$2,399.98/ea $0.00