Skip to product information
1 of 8

Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa

Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa

Regular price $1,599.98 USD
Regular price Sale price $1,599.98 USD
Sale Sold out
Shipping calculated at checkout.

Product Overview

With its focus on everyday usability, the Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa with 2 Ottoman Deep Seat Corduroy Modern Cloud Sofa, Modular Sofas for Living Room, Bedroom and Apartment, Black brings long-lasting value to living rooms. measuring 60"D x 142"W x 35.5"H, weighing 1500 Pounds, available in Corduroy - Black. Notable features include cloud couch and couch delivers, contributing to its modern character.

Key Features

  • Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 26-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Four adjustable back cushions and two detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
  • Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 142"W x 60"D x 35.5"H and seating for 2–4 people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
  • Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this modern couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
  • Two Sets of Sofa Legs & Effortless Assembly: This sectional couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
  • Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This U-shaped couch will be delivered in 3 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team

Why Choose the Vesgantti 142" U Shaped Sectional Couch

Consistently chosen by sofas & couches buyers, the Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa with 2 Ottoman Deep Seat Corduroy Modern Cloud Sofa, Modular Sofas for Living Room, Bedroom and Apartment, Black delivers durable construction alongside cloud couch for reliable long-term durability.

Best For

The Vesgantti 142" U Shaped Sectional Couch is best suited for: stretching out or curling up, all body types.

Quick Summary

The Vesgantti 142" U Shaped Sectional Couch is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 26 inches. Weight Limit: 1500 Pounds. Seating Capacity: 4. Price: $1599.98.

Product Specifications

Specification Details
Brand Vesgantti
Assembly Required Yes
Seat Depth 26 inches
Weight Limit 1500 Pounds
Seating Capacity 4
Product Dimensions 60"D x 142"W x 35.5"H
Item Weight 35 Kilograms
Type Sectional
Color Corduroy - Black
Style Modern

Product features

Materials and care

Merchandising tips

View full details
Your cart
Product Product subtotal Quantity Price Product subtotal
Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional Sofa by Vesgantti
Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional SofaSPH-B0F8BQ9J7W
Vesgantti 142" U Shaped Sectional Couch, Comfy Cloud Modular Sectional SofaSPH-B0F8BQ9J7W
$1,599.98/ea
$0.00
$1,599.98/ea $0.00