Product Overview
The Vesgantti 118" Modular Sectional Couch, Comfy Corduroy Upholstered Cloud Couches for Living Room, Modern 3 Seater Sofa with Deep Seat, Beige reflects ergonomic thinking, providing lasting comfort suitable for bedrooms. measuring 40.6"D x 118"W x 31.5"H, weighing 700 Pounds, available in Beige. Notable features include comfortable seating and 118 inch, contributing to its comfortable character.
Key Features
- Spacious and Comfortable Seating: Our 118 inch oversized couch features 25.2 inch deep seating area, creating a ample leisure space for you and your family. This cloud couch is designed with double-layered high-resilience foam seat cushions, thick back cushions, providing ergonomic support for your waist and back. The extremely soft seat cushions make you feel like you're in the clouds, making the sofa an ideal choice for relaxation
- Premium Corduroy Fabric: The modular sofa is upholstered in wrinkle-resistant & soft corduroy fabric, which feels silky soft to touch. The impressive durability and stain-fighting prowess of corduroy fabric keep your sectional sofas looking fresh and lively, perfet for homes with children or pets. We have multiple colors for option to match different decoration styles for fully meeting your personalized needs. Tips: There may be slight color difference due to light or display reasons
- Convertible Modular Sectional Sofa: This modular couches allows you to customize the layout to fit your space and lifestyle. The simple solid color design makes this sofa to easily blend into different decoration style and occasions, whether it's the living room, bedroom, office and children's play areas
- No Assembly Required: Vesgantti cloud sofa arrives tool-free and vacuum-packed for effortless setup. This modular sofa will be delivered in 2 boxes. Simply unbox, allow it to expand for up to 72 hours, and it’s ready to enjoy! Note: Minor wrinkles are normal after compression, and cushions may take up to three days to fully regain their fluffiness
- Durable and Long-lasting Support: This modern sofa is crafted from high-resilience foam, providing lasting support and ultimate comfort. The foam utilizes quick rebound technology, maintaining its shape after prolonged use while providing a comfortable and stable seat. This full foam couch is perfect for a living room, bedroom, office, apartment, guest rooms, and children's play areas, encouraging children to play on its luxurious surface
Why Choose the Vesgantti 118" Modular Sectional Couch
Buyers gravitate toward the Vesgantti 118" Modular Sectional Couch, Comfy Corduroy Upholstered Cloud Couches for Living Room, Modern 3 Seater Sofa with Deep Seat, Beige for the practical reasons: minimalist construction, comfortable seating, and the simple assembly that results.
Best For
The Vesgantti 118" Modular Sectional Couch is best suited for: a living room.
Quick Summary
The Vesgantti 118" Modular Sectional Couch is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: No. Seat Depth: 25.2 inches. Seat Height: 20 Inches. Weight Limit: 700 Pounds. Price: $599.98.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Assembly Required | No |
| Seat Depth | 25.2 inches |
| Seat Height | 20 Inches |
| Weight Limit | 700 Pounds |
| Seating Capacity | 4 |
| Product Dimensions | 40.6"D x 118"W x 31.5"H |
| Item Weight | 70.6 Pounds |
| Type | Sectional |
| Color | Beige |
