Product Overview
Built with long-lasting attention to detail, the Vesgantti 108" Sectional Sleeper Sofa, 6-Seater Oversized Modular Cloud Couch with Movable Ottoman, Chenille Large Sofa Bed Convertible Deep Seat Couches for Living Room, Bedroom and Apartment, White provides space optimization for home offices. measuring 60"D x 108"W x 35.5"H, weighing 1500 Pounds, available in Chenille - Snow White. Notable features include cloud couch and couch delivers, contributing to its minimalist character.
Key Features
- Cloud Couch Delivers Cloud-like Comfort: Enjoy the generous 56-inch seat depth and 30-inch ottoman—significantly deeper than others, perfect for stretching out or curling up. The dual-layer cushions combine high-resilience foam with plush filling for lasting luxury. Three adjustable back cushions and four detachable armrest pillows provide personalized support. The ergonomic design reduces pressure points, ensuring long-lasting comfort for everyone—ideal for extended lounging sessions
- Fully Modular Design for Customizable Layouts: This modular sofa offers unmatched flexibility, with an overall size of 108"W x 60"D x 35.5"H and seating for 3+ people. You can easily customize the seating arrangement to fit your space and lifestyle. Its rearrangeable components make refreshing the look of your living room effortless, making this cloud sofa both a chic and practical addition to your home. Enjoy the freedom to design your ideal lounging area with this innovative sectional sofa
- Premium Fabrics in 7 Color Options: Choose from modern chenille or retro corduroy—both fabrics are soft, gentle on the skin, pet-friendly, and easy to maintain. Available in 7 vibrant or neutral colors, it matches perfectly with any decor style. Whether your style is minimalist or vintage-inspired, this 5 seater sectional couch will add elegance to your space. Note: Slight color variations may occur due to lighting or monitor differences
- Two Sets of Sofa Legs & Effortless Assembly: This oversized couch comes with two leg height options—2.76" and 4.72"—so you can customize the height to suit your preference. Choose the lower height for a relaxed look, or the higher height for easier access, which also allows robot vacuums to clean underneath with ease. Assembly is simple: with clear instructions and all the necessary tools included, you can have it setup in just 30 minutes with no extra equipment required
- Durable Construction & Customer-Centric Support: The sofa frame (armrests, backrests, and seat frames) is made from FSC-certified wood, with self-developed reinforced components, our modular sectional sofa offers better stability than others, making it ideal for all body types. This big comfy couch will be delivered in 3 boxes, please check all parts before assembly. If you're not satisfied with the sofa you received, please feel free to contact our customer service team
Why Choose the Vesgantti 108" Sectional Sleeper Sofa
The Vesgantti 108" Sectional Sleeper Sofa, 6-Seater Oversized Modular Cloud Couch with Movable Ottoman, Chenille Large Sofa Bed Convertible Deep Seat Couches for Living Room, Bedroom and Apartment, White brings sleek and sturdy qualities together, supported by cloud couch. The outcome is everyday usability that addresses real sofas & couches needs.
Best For
The Vesgantti 108" Sectional Sleeper Sofa is best suited for: stretching out or curling up, all body types.
Quick Summary
The Vesgantti 108" Sectional Sleeper Sofa is a Sofas & Couches product by Vesgantti. Brand: Vesgantti. Assembly Required: Yes. Seat Depth: 56 inches. Seat Height: 21 Inches. Weight Limit: 1500 Pounds. Price: $1999.98.
Product Specifications
| Specification | Details |
|---|---|
| Brand | Vesgantti |
| Assembly Required | Yes |
| Seat Depth | 56 inches |
| Seat Height | 21 Inches |
| Weight Limit | 1500 Pounds |
| Seating Capacity | 6 |
| Product Dimensions | 60"D x 108"W x 35.5"H |
| Item Weight | 35 Kilograms |
| Type | Sofa Bed |
| Color | Chenille - Snow White |
